Services / 03

Factory Setup

For companies building or expanding a plastic parts operation. We help specify the line, lay out the floor and bring it to stable production.

SVC-03
Photo pending

Who it is for

  • New molding operations
  • Companies adding cleanroom capacity
  • Investors building a local supply chain

Scope

  • Capacity and equipment study
  • Layout and utility requirements
  • Machine installation and commissioning
  • Operator and technician training

Deliverables

  • Equipment and utility specification
  • Factory layout
  • Commissioning checklist
  • Training and SOP package

Process

From drawing to production, without handoffs getting lost.

Service scopes shown for demo. Final scope, deliverables and timeline are confirmed per project.

  1. Requirements and product mix

    Part family, tonnage, volume, cleanroom and quality targets.

  2. Capacity and layout

    Machine list, utility load, material flow and floor plan.

  3. Equipment and installation

    Selection, procurement support, installation and commissioning.

  4. Trial run and handover

    Process setup, training, SOP and stable production check.

FAQ

FAQ

Do you supply machines?

We specify and source equipment through qualified suppliers. We can support procurement, installation and commissioning, or work with your existing vendors.

How long does a line take?

A small line can be specified in 2–3 weeks; installation and stable production typically take 6–12 weeks, depending on utilities and cleanroom scope.

Next step

Scope the project.

Tell us the part, volume, target market and timeline. We will come back with a scope and the missing questions.